Seeka HQ, Te Puke, Tauranga

  • Seeka HQ - Triton 50 + Top-Hat Channel
    Seeka HQ - Triton 50 + Top-Hat Channel
  • Seeka HQ - Triton 50 + Top-Hat Channel
    Seeka HQ - Triton 50 + Top-Hat Channel
  • Seeka HQ - Triton 50 + Top-Hat Channel
    Seeka HQ - Triton 50 + Top-Hat Channel
Case Studies
Seeka HQ, Te Puke, Tauranga
For the interior fit-out & refurbishment of the Seeka Te Puke HQ, David Page of Page Henderson Architects wanted to respect the original iconic Kiwi 360 building including the unique rotunda that welcomes staff & visitors into the reception area. The finished design features trapezoidal shaped Triton 50 acoustic panels which were cut on-site and installed between expressed beams incorporating a top-hat channel along the leading edge to create a negative detail. Ceilings unlimited did a great job with lining up all the top-hat channel up with lasers so that the tiles transitioned around the room symmetrically. This was extended out into the new open plan office wing and café area to continue the design aesthetic. The result is a clean uniform look sympathetic to the original building design.
Join our mailing list
Sign up to receive updates on new products & custom builds